Dewatering station with barge and pumps

Ontario
Mining
2022
Mandate

Construction of a new mining project under winter conditions

Our mandate was to provide a solution and the necessary equipment to ensure effective management of the tailings ponds. The pumping unit also had to be operable under winter conditions.

In collaboration with our partners in Rouyn-Noranda, we have designed and built a complete dewatering station for the management of tailings ponds, in an assembly of four (4) shipping containers, three (3) placed side-by-side and an additional one (1) on top.
The containers are assembled on a 40′ x 24′ barge floating above a pond. Access to the building is provided by a custom-built catwalk. This all-in-one solution achieves a pumping capacity of 8000 GPM at 90psi.

The pump house includes, among others:

  • 4x Technosub VT vertical turbine pumps 2 stages
  • 1x Custom-built barge
  • Specialized instrumentation to gather data on pumping operations
Projet Technosub 2022 Vue extérieur hiver
Details

Strengths

The catwalk
Allows easier access for moving or transporting heavy equipment on the barge.
Large-format, two-storey construction

Challenges

Designed to withstand extreme weather conditions
Both in winter and summer.
Gallery
Related products
Mine Water
Vertical Turbine Pumps

VT Series

Technosub
Promotion - Technosub

At your fingertips

Representatives & Branches